Toyota Camry

1992-1997 of release

Repair and operation of the car



Toyota Camry
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Capital repairs of engines
   4.2. General information
   4.3. Check of a compression
   4.4. Recommendations about removal of the engine
   + 4.5. Removal and installation of the engine
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a bent shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Bent shaft
   + 4.15. Survey and choice of radical and conrod bearings
   4.16. Control of a side play of assembly of the balance weight (engine 5S-FE)
   4.17. Engine balance of assembly at capital repairs
   4.18. Installation of piston rings
   + 4.19. Installation of a bent shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a bent shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Start of the engine after capital repairs
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Decrease in toxicity
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment




4.23. Start of the engine after capital repairs

PERFORMANCE ORDER

1. On the engine installed in a motor compartment of the car check levels of engine oil and cooling liquid. Check that all earlier removed wires and hoses to an ustanovla ны on the places.

2. Disconnect the electric socket from the block of ignition and remove the relay of the fuel pump. Turn the engine a starter until the control lamp of pressure of oil does not go out then connect the electric socket to the block of ignition and install the relay of the fuel pump.

3. Start the engine. Start of the engine can be more long, than usually because of shutdown of fuel system.
4. During the operation of the engine idling check existence of leak of fuel, cooling liquid and oil. At this stage of operation of the engine the smell and smoke from heated parts of the engine at burning out of the oil which got on the engine at assembly can be observed.
5. The engine has to idle until cooling liquid does not heat up that will be felt through the top hose of a radiator. Then switch off the engine. After cooling of the engine check the level of oil and cooling liquid.
6. At installation in the engine of new pistons, piston rings or bearings of a bent shaft it is necessary to make an engine running in during the run of the first 800 km. Not an eksplua to a tiruyta the engine with completely open butterfly valve or under big loading with a low frequency of rotation of the engine. It is recommended to replace oil and an oil filter at the end of the running in period.