Toyota Camry

1992-1997 of release

Repair and operation of the car



Toyota Camry
+ General data
+ 1. Maintenance
+ 2. Engine
- 3. Six-cylinder V6 engines
   3.2. General information
   3.3. The repair which is not demanding removal of the engine
   + 3.4. Top Dead Point (TDP) of the piston of the first cylinder
   + 3.5. Cover of a head of the block of cylinders
   + 3.6. Inlet collector
   3.7. Final collector
   + 3.8. Gear belt and pulleys
   3.9. Replacement of a forward sealing ring of a bent shaft
   3.10. Replacement of sealing rings of camshafts
   + 3.11. Camshafts and pushers
   + 3.12. Head of the block of cylinders
   + 3.13. Oil pallet
   - 3.14. Oil pump
      3.14.2. Check
      3.14.3. Installation
   3.15. Drive flywheel / plate
   3.16. Replacement of a back sealing ring of a bent shaft
   3.17. Suspension bracket of the power unit
+ 4. Capital repairs of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. System of ignition
+ 8. Decrease in toxicity
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment




3.14.3. Installation

PERFORMANCE ORDER
1. Replace a sealing ring in the case of the oil pump.
2. Install external and internal rotors in the case of the oil pump, at the same time combine adjusting tags on rotors of the oil pump.
3. Apply a thin film of vaseline on the interfaced surface of a cover of the oil pump, install a cover on the case of the oil pump and screw screws.
4. Oil details of the safety valve pure engine and install them in the case of the oil pump.
5. Clear the surface of the case of the oil pump, interfacing my to the block of cylinders of the engine from oil.
Apply a layer of sealant with a diameter of 2-3 mm on the interfaced surface of the case of the oil pump.
Establish sealing laying of round section in a flute of the case of the oil pump.
6. Combine a groove on an internal rotor of the oil pump with a spline of a bent shaft and install the oil pump on the block of cylinders of the engine.
7. Fix the oil pump by bolts, tightening them crosswise.
8. Establish an oil receiver pipe with new laying and fix by bolts.
9. Further installation is made in the sequence, the return to removal. Add engine oil in the engine.